Comprising of 2 & 3 BHK Apartments in Kondapur, it is close to just about everything that matters.
With easy access to, Education, Healthcare, Recreation, Office Workspaces and more; you are surrounded by life but you can still pull back at the end of the day from this hustle and bustle to give time to yourself and your family!
Or, if you'd like a copy of the physical brochure couriered to your location. Click Here
Engineering
Built with precision moulded concrete structures to ensure factory-like repeatable quality in each home.
Shear Wall Engineering
The monolithic structure is stronger, has a longer life and is more earthquake resistant.
Unified build process. Structure, walls, electrical and plumbing are installed and built simultaneously.
No need for plastering because the wall surface is smooth and precise.
Pleasing and functional interior walls that don’t have visible beams and columns.
The factory-like repetitive ‘build and check’ process ensures predictable quality.
Concrete is an excellent insulator. Our buildings are cooler and have better sound insulation.
Construction Partner
Material Brands Used
Structure
Finishes
Plumbing
Electrical
Fire Safety
Masterplan and Floorplans
Masterplan
Floorplans
Rotate device for best experience!
Tower A
Tower B
Tower C
Tower D
Rotate device for best experience!
Rotate device for best experience!
Rotate device for best experience!
Rotate device for best experience!
Amenities
Clubhouse
Other
The Square - Clubhouse
Swimming Pool
Gymnasium
Salon space
ATM space
Multipurpose Hall space
Party Hall space
Café’ space
Creche space
Supermarket space
Squash court
Badminton court
Table Tennis
Spread Across the Project
Tennis court
Half Basketball court
Cricket Net
Children’s play area
Cycling track
Meditation area
Gazebo
Banquet lawn
Multipurpose lawn
Engineering
Every balcony railing has vertical divisions. This ensures that children cannot climb them.
Safety Engineering
Depending on the height of the building, 1.1m to 1.2m high balcony railings ensure safety on any floor.
Apart from a few horizontal railing members that are a structural requirement, all other railing members are vertical.
Compliant with the Bureau of Indian Standards National Building Code.
Bureau of Indian Standards
Construction
Updates
May 2023
April 2023
March 2023
February 2023
January 2023
December 2022
November 2022
October 2022
September 2022
August 2022
July 2022
June 2022
May 2022
April 2022
March 2022
February 2022
January 2022
December 2021
November 2021
October 2021
September 2021
August 2021
July 2021
June 2021
May 2021
April 2021
March 2021
February 2021
January 2021
December 2020
November 2020
October 2020
September 2020
August 2020
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
Balcony/green deck railing is completed till the 21st floor. Internal flooring on the 14th floor is in progress. GI wire pulling till the 21st floor is completed while the FAS wire pulling is completed till the 20th floor. For the corridors, the 2nd coat of putty is completed till the 16th floor and the flooring is completed till the 10th floor.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
1st floor slab shuttering works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
11th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
Balcony/green deck railing is completed till the 20th floor. Internal flooring of the 13th and 14th floors are in progress. For the corridors, the 2nd coat of putty is completed from the 1st to 5th and the 11th to 15th floors, the flooring is completed till the 10th floor and the electrical conduiting of the 18th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Updates
The terrace slab is completed and the swimming pool bottom slab shuttering works are in progress. The podium and the B 1 level slabs are completed.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
Terrace slab completed, balcony waterproofing works are in progress and the balcony/green deck railing is completed till the 20th floor. Internal flooring on the 12th and 13th floors are in progress. GI wire pulling till the 21st floor is completed while the FAS wire pulling is completed till the 19th floor. For the corridors, the 2nd coat of putty is completed till the 12th floor and the flooring is completed till the 8th floor. The electrical conduiting of the 19th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
Ground floor level shuttering completed and steel works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
7th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
Terrace slab completed. Balcony/green deck railing is completed till the 20th floor. Internal flooring of the 11th and 12th floors are in progress. For the corridors, the 2nd coat of putty is completed till the 12th floor is completed and the flooring is completed till the 7th floor and electrical conduiting of the 14th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
Block work is completed and plastering is in progress for the Ground and 1st floor. Works are in progress for the STP.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
Terrace slab completed, balcony waterproofing works are in progress and the balcony/green deck railing is completed till the 19th floor. Internal flooring on the 8th and 9th floors are in progress. GI wire pulling till the 20th floor is completed while the FAS wire pulling is completed till the 19th floor. For the corridors, the 2nd coat of putty and works are in progress on the4th floor while the flooring is completed till the 5th floor and electrical conduiting of the14th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
Ground floor level shuttering and steel works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
7th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
Terrace slab completed. Balcony/green deck railing is completed till the 20th floor. Internal flooring of the 10th floor is in progress. For the corridors, the 2nd coat of putty and works are in progress on the 2nd floor while the flooring is completed till the 6th floor and electrical conduiting of the 14th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
Clubhouse: Block and terrace works are in progress for the STP, columns casting for level above B-1 is completed.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
22nd floor slab completed. Balcony waterproofing works are in progress and the balcony/green deck railing is completed till the 18th floor. Internal flooring of the 6th floors are in progress. GI wire pulling till the 19th floor is completed while the FAS wire pulling is completed till the 18th floor. For the corridors, the 2nd coat of putty and works are in progress on the 4th floor. Lift block work and plastering till the 18th floor is completed.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
round floor level shuttering and steel works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
5th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
21st floor slab completed. Balcony/green deck railing is completed till the 15th floor. Internal flooring of the 6th floor is in progress. For the corridors, the 2nd coat of putty and works are in progress on the 2nd floor.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
Clubhouse: Columns casting is in progress above the 5th floor and blockworks on 1st and 2nd floors are in progress.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
20th floor slab completed. Shuttering & steel works on the 21st floor along with other basement works are in progress. | Balcony waterproofing works are in progress on the 6th floor and the balcony/green deck railing is completed till the 16th floor. Internal flooring of the 4th and 5th floors are in progress. GI wire pulling till the 17th floor is completed while the FAS wire pulling is completed till the 16th floor. Both for apartments and corridors, the 1st coat of putty and works are in progress on the 9th floor. Lift block work and plastering till the 9th floor is completed.
TS RERA Number: TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
Basement Level 1 NT works are in progress.
TS RERA Number: TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
3rd floor slab completed. Excavation and footing works of the Entry ramp between Tower C and STP is in progress.
TS RERA Number: TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
19th floor slab completed. Shuttering & steel works on the 20th floor along with other basement works are in progress. Balcony waterproofing works are in progress on the 12th and 14th floors and the balcony/green deck railing is completed till the 15th floor. Internal flooring of the 6th floor is in progress. GI wire pulling till the 17th floor is completed while the FAS wire pulling is completed till the 15th floor. Both for apartments and corridors, the 1st coat of putty and works are in progress on the 7th floor. Lift block work and plastering till the 11th floor is completed.
TS RERA Number: TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
COMMON AREAS: Clubhouse 4th floor slab completed and the 1st floor block work is in progress. installation of header and branch lines along with full welding is completed on the ground and 1st floors. | STP: B1 level slab completed and column casting is in progress for the above levels. Excavation and footing works of the Entry ramp between Tower C and STP is in progress.
Tower A
Tower C
Tower D
Tower B
Common Areas
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
Shuttering & steel works in progress on the 19th floor. Painting works in the basement are in progress. Balcony/Green Deck Railing till the 13th floor is completed. Waterproofing works of the toilet on the 12th and the balcony on the 6th floor are in progress. Lift block work & plastering till the 4th floor are completed. 1st coat of putty is complete on the 6th floor.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
Shuttering & steel works in progress on the 2nd floor. | Excavation and footings works of the Entry ramp between Tower C and STP is in progress.