Comprising of 2 & 3 BHK Apartments in Kondapur, it is close to just about everything that matters.
With easy access to, Education, Healthcare, Recreation, Office Workspaces and more; you are surrounded by life but you can still pull back at the end of the day from this hustle and bustle to give time to yourself and your family!
Or, if you'd like a copy of the physical brochure couriered to your location. Click Here
Engineering
Built with precision moulded concrete structures to ensure factory-like repeatable quality in each home.
Shear Wall Engineering
The monolithic structure is stronger, has a longer life and is more earthquake resistant.
Unified build process. Structure, walls, electrical and plumbing are installed and built simultaneously.
No need for plastering because the wall surface is smooth and precise.
Pleasing and functional interior walls that don’t have visible beams and columns.
The factory-like repetitive ‘build and check’ process ensures predictable quality.
Concrete is an excellent insulator. Our buildings are cooler and have better sound insulation.
Construction Partner
Material Brands Used
Structure
Finishes
Plumbing
Electrical
Fire Safety
Masterplan and Floorplans
Masterplan
Floorplans
Rotate device for best experience!
Tower A
Tower B
Tower C
Tower D
Rotate device for best experience!
Rotate device for best experience!
Rotate device for best experience!
Rotate device for best experience!
Amenities
Clubhouse
Other
The Square - Clubhouse
Swimming Pool
Gymnasium
Salon space
ATM space
Multipurpose Hall space
Party Hall space
Café’ space
Creche space
Supermarket space
Squash court
Badminton court
Table Tennis
Spread Across the Project
Tennis court
Half Basketball court
Cricket Net
Children’s play area
Cycling track
Meditation area
Gazebo
Banquet lawn
Multipurpose lawn
Engineering
Every balcony railing has vertical divisions. This ensures that children cannot climb them.
Safety Engineering
Depending on the height of the building, 1.1m to 1.2m high balcony railings ensure safety on any floor.
Apart from a few horizontal railing members that are a structural requirement, all other railing members are vertical.
Compliant with the Bureau of Indian Standards National Building Code.
Bureau of Indian Standards
Construction
Updates
September 2023
August 2023
July 2023
June 2023
May 2023
April 2023
March 2023
February 2023
January 2023
December 2022
November 2022
October 2022
September 2022
August 2022
July 2022
June 2022
May 2022
April 2022
March 2022
February 2022
January 2022
December 2021
November 2021
October 2021
September 2021
August 2021
July 2021
June 2021
May 2021
April 2021
March 2021
February 2021
January 2021
December 2020
November 2020
October 2020
September 2020
August 2020
Tower A
Tower B
Tower C
Tower D
CLUBHOUSE and Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
External painting works on the north and west side are in progress. Completed are apartment works like the balcony tiling (till the 19th floor), flooring (till the 20th floor), toilet tiling (till the 21st floor), 1st coat of putty (till the 19th floor) and the ledge wall (till the 22nd floor). In progress are works like the door fixing (on the 10th floor), kitchen dado (on the 11th floor), copper piping (on the 9th floor), corridor tiling (on the 20th floor) entrance lobby and the fire services.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
3rd floor level works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
19th floor works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
External painting works on the north and west side are in progress. Completed are apartment works like the balcony tiling (till the 17th floor), flooring (till the 17th floor), toilet tiling (till the 18th floor), 1st coat of putty (till the 20th floor) and the ledge wall (till the 22nd floor). In progress are works like the door fixing (on the 10th floor), kitchen dado (on the 11th floor), copper piping (on the 8th floor), corridor tiling (on the 18th floor) entrance lobby and the fire services.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
CLUBHOUSE and Common Area Update
In progress are works related to block & plastering (on the 3rd and 4th floors), putty (on the 1st and 2nd floors), toilets tiling (on the 2nd floor), staircase granite (on the 2nd staircase) and the podium waterproofing. The 3rd floor sprinkler line installation for the fire protection system is completed. In the STP, while the filter tank and ducts installation are completed, the railing works are in progress. In the fire pump room, both the DG and the electrical trail runs are completed.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
At the terrace floor level, all parapet walls are completed and above the terrace, the waterproofing works are also completed. External painting works on the north and west side are in progress. Apartment flooring along with balcony tiling works on the 20th floor are in progress as well as door works till the 10th floor. Toilet tiling works till the 19th floor are completed. 1st coat of coarse putty and putty works are in progress on the 20th floor. Entrance lobby works and the fire service shaft cable tray fixing works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
2nd floor level works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
16th floor works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
At the terrace floor level, all parapet walls are completed and above the terrace, the waterproofing works are also completed. External painting works on the south side are in progress. Apartment flooring along with balcony tiling works on the 18th floor are in progress as well as door works till the 10th floor. Toilet tiling works till the 17th floor are completed. 1st coat of coarse putty and putty works are in progress on the 20th floor. Entrance lobby works and the fire service shaft cable tray fixing works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
The 3rd floor block work along with the 1st coat of putty and staircase granite works are in progress. In the STP, the epoxy coating, pumps' installation and piping works are in progress.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
At the terrace floor level, all parapet walls are completed and above the terrace, the waterproofing works are in progress. External painting works on the north side are in progress. Wall cladding works in the entrance lobby are in progress. The 1st coat of putty works are in progress on the 18th floor. Toilet water proofing works are in progress on the 22nd floor while apartment flooring on the 18th floor is in progress. Corridor tiling works till the 13th floor are completed. Staircase railings till the 10th floor are completed while the lift's door frames are installed, the cladding works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
2nd floor level works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
14th floor works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
At the terrace floor level, all parapet walls are completed and above the terrace, the waterproofing works are in progress. External painting works on the south side are in progress. The 1st coat of putty works are in progress on the 20th floor. Toilet water proofing works are in progress on the 21st & 22nd floors while apartment flooring on the 18th floor is in progress. While the lift's door frames are installed, the cladding works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
Clubhouse: Above the terrace level, the swimming pool side wall casting is completed and the 3rd floor block work along with the 1st coat of putty is in progress.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
Balcony tiling on the 13th floor are in progress. Installation of the balcony french & utility casement doors till the 12th floor is completed. Internal flooring on the 14th floor is in progress. Toilet water proofing works on the 21st floor are in progress and toilet tiling works are in progress on the 16th & 17th floors.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
Ground floor level slab completed and 1st floor shuttering works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
12th floor works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
Staircase railing completed till the 20th floor. Balcony/green deck railing is completed till the 21st floor. Internal flooring of the 15th & 16th floors are in progress, toilet water proofing works are in progress on the 20th & 21st floors and the electrical conduiting of the 19th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
Above the terrace, shuttering work is in progress and the swimming pool bottom slab work is completed. Blockwork and plastering is completed till the 2nd floor.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
Balcony/green deck railing is completed till the 21st floor. Internal flooring on the 14th floor is in progress. GI wire pulling till the 21st floor is completed while the FAS wire pulling is completed till the 20th floor. For the corridors, the 2nd coat of putty is completed till the 16th floor and the flooring is completed till the 10th floor.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
1st floor slab shuttering works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
11th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
Balcony/green deck railing is completed till the 20th floor. Internal flooring of the 13th and 14th floors are in progress. For the corridors, the 2nd coat of putty is completed from the 1st to 5th and the 11th to 15th floors, the flooring is completed till the 10th floor and the electrical conduiting of the 18th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Updates
The terrace slab is completed and the swimming pool bottom slab shuttering works are in progress. The podium and the B 1 level slabs are completed.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
Terrace slab completed, balcony waterproofing works are in progress and the balcony/green deck railing is completed till the 20th floor. Internal flooring on the 12th and 13th floors are in progress. GI wire pulling till the 21st floor is completed while the FAS wire pulling is completed till the 19th floor. For the corridors, the 2nd coat of putty is completed till the 12th floor and the flooring is completed till the 8th floor. The electrical conduiting of the 19th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
Ground floor level shuttering completed and steel works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower C Update
7th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower D Update
Terrace slab completed. Balcony/green deck railing is completed till the 20th floor. Internal flooring of the 11th and 12th floors are in progress. For the corridors, the 2nd coat of putty is completed till the 12th floor is completed and the flooring is completed till the 7th floor and electrical conduiting of the 14th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
Block work is completed and plastering is in progress for the Ground and 1st floor. Works are in progress for the STP.
Tower A
Tower B
Tower C
Tower D
Common Area
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower A Update
Terrace slab completed, balcony waterproofing works are in progress and the balcony/green deck railing is completed till the 19th floor. Internal flooring on the 8th and 9th floors are in progress. GI wire pulling till the 20th floor is completed while the FAS wire pulling is completed till the 19th floor. For the corridors, the 2nd coat of putty and works are in progress on the4th floor while the flooring is completed till the 5th floor and electrical conduiting of the14th floor is in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower B Update
Ground floor level shuttering and steel works are in progress.
TS RERA Number: P02400003069
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.