A wisely engineered, vibrant community comprising of 1,040 homes in Bolarum
With uniformly designed 2 bedroom apartments; VB City offers residents a vibrant and convenient lifestyle. A wide range of amenities combined with the ease of access to educational institutes, hospitals and entertainment destinations makes life here ideal.
842sft
2BHK Apartments
36,000 sft Clubhouse
1.2km to Railway Station
Get In Touch
spotlight apartment units
01
03
842 sft. 2BHK Apartments. 'Phase 1' ready to move in with easy access to the Kids Play Area. Apartments on the First and Fifth Floor available. No need to wait for the lift. Newly available units, High demand!
VB CITY, HYDA-03
Kompally - Bolarum
02
03
842 sft. Premium Garden View 2BHK Apartments. 'Last few ready to move in units with pleasing views of the Garden area across Phase 1 available.
VB CITY, HYDC-04
Kompally - Bolarum
03
03
842 sft. 2BHK Apartments. 'Phase 1' ready to move inwith easy access to the Kids Play Area. Apartments on the First and Fifth Floor available. No need to wait for the lift. High demand!
Or, if you'd like a copy of the physical brochure couriered to your location. Click Here
Engineering
Built with precision moulded concrete structures to ensure factory-like repeatable quality in each home.
Shear Wall Engineering
The monolithic structure is stronger, has a longer life and is more earthquake resistant.
Unified build process. Structure, walls, electrical and plumbing are installed and built simultaneously.
No need for plastering because the wall surface is smooth and precise.
Pleasing and functional interior walls that don’t have visible beams and columns.
The factory-like repetitive ‘build and check’ process ensures predictable quality.
Concrete is an excellent insulator. Our buildings are cooler and have better sound insulation.
Construction Partner
Material Brands Used
Structure
Finishes
Plumbing
Electrical
Fire Safety
Masterplan and Floorplans
Masterplan
Floorplans
Rotate device for best experience!
Rotate device for best experience!
Amenities
Clubhouse
Others
The Square - Clubhouse
Swimming Pool
Toddler Pool
Gymnasium
Yoga and Aerobics Space
Multipurpose Hall
Indoor Games (Carrom & Chess).
Table Tennis
Seating Spaces
Clinic
Salon/Spa
Kid's Play Area
Seating Plaza
Gazebo
Multipurpose Lawns
Yoga/Meditation deck
Banquet Lawn
Basketball Half Court
Tennis Court
Cricket Practice Nets
Badminton Court
Cycling Track
Engineering
Every balcony railing has vertical divisions. This ensures that children cannot climb them.
Safety Engineering
Depending on the height of the building, 1.1m to 1.2m high balcony railings ensure safety on any floor.
Apart from a few horizontal railing members that are a structural requirement, all other railing members are vertical.
Compliant with the Bureau of Indian Standards National Building Code.
Bureau of Indian Standards
Construction
Updates
March 2023
January 2023
December 2022
November 2022
October 2022
September 2022
August 2022
July 2022
June 2022
May 2022
April 2022
March 2022
February 2022
January 2022
December 2021
November 2021
October 2021
September 2021
August 2021
July 2021
June 2021
May 2021
April 2021
March 2021
February 2021
January 2021
December 2020
November 2020
October 2020
September 2020
August 2020
July 2020
June 2020
May 2020
March 2020
February 2020
Tower M
Tower N
Tower P
Tower Q
Tower R
Common Area
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Update
Quality inspection is completed for both lifts and they are ready for handover. External plumbing lines are completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Update
Quality inspection is completed for both lifts and they are ready for handover. External plumbing lines are completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Update
Door and window frames fixing in the balcony and utility areas are in progress on the5th floor. Tiling works are in progress on the 5th floor. Primer work for the 5th floor is in progress. External plumbing lines are completed. Mechanical installation for both lifts are completed and high speed works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Update
Quality inspection is completed for both lifts and they are ready for handover. External plumbing lines are completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Update
Quality inspection is completed for lift and is ready for handover. External plumbing lines are completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
Works are in progress.
Tower M
Tower N
Tower P
Tower Q
Tower R
Common Area
TS RERA Number: TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Update
External texture 2nd coat of paint is completed for 28 out of the total of 36 faces. All tiling works are completed. Internal Wall Putty & Sanding works: all floors primer work is completed, 1st coat of painting is in progress. Lifts (Lift 1): High speed completed and ready for quality inspection. (Lift 2): high speed installation works are in progress.
TS RERA Number: TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Update
External texture 2nd coat of paint is in progress. All tiling works are completed. Internal Wall Putty & Sanding works: All floors primer work is completed, 1st coat painting is in progress. Lifts (Lift 1): High speed completed and ready for quality inspection. (Lift 2): cabin installation works are completed and start up works are in progress.
TS RERA Number: TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Update
Terrace waterproofing brick bat and Ponding test is completed. 2nd floor tiling works are in progress. Door frames and shutters are in progress on the 5th floor. Window frames fixing in the balcony and utility areas are in progress. Internal Wall Putty & Sanding works: All floors primer and 1st coat of painting is completed, 2nd coat of putty on the 5th floor is in progress. Lifts (1&2): Door entrance installation along with Rail installation completed, cabin installation works are in progress.
TS RERA Number: TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Update
All Door frames and 1st coat of enamel painting completed. All tiling works are completed. Internal Wall Putty & Sanding works: 1st coat of painting of all floors works is completed. Lifts (Lift 1): High speed completed and quality inspection completed. (Lift 2): Installation works completed and start-up works are in progress.
TS RERA Number: TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Update
All tiling works are completed. Internal Wall Putty & Sanding works: primer works and 2nd coat of putty till the 5th floor is completed. High speed works are in progress.
TS RERA Number: TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
PLAY AREA: MS fabrication works completed, electrical poles erection works are in progress.
Tower M
Tower N
Tower P
Tower Q
Tower R
Common Area
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Update
External texture and 1st coat of paint completed, 2nd coat in progress. Door frames and shutters along with kitchen angles and granite counters completed. UPVC works on windows, ventilators, balcony & utility is completed. Lift granite cladding works are completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Update
External texture and 1st coat of paint completed, 2nd coat in progress. Door frames and shutters along with kitchen angles and granite counters completed. UPVC works on windows, ventilators, balcony & utility is completed. Lift granite cladding works are completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Update
Terrace waterproofing Ponding test is in progress. Door frames and shutters completed till the 4th floor. Window frames fixing is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Update
External texture and 1st coat of paint completed, Terrace Water Proofing Mosaic work is in progress. Door frames and shutters along with kitchen angles and granite counters completed. UPVC works on windows, ventilators, balcony & utility is completed. Podium waterproofing between Q-R-Compound wall road works are completed. Lift granite cladding works are completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Update
External texture and 1st coat of paint completed, 2nd coat in progress. All door frames fixing completed, shuttering in progress. Kitchen angles and granite counters completed till 3rd floor. UPVC works on windows and ventilators is completed. Podium waterproofing between Q-R-Compound wall road works are completed. Lift granite cladding works are completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Updates
PLAY AREA Basketball court soil compaction and WMM laying completed.
Tower M
Tower N
Tower Q
Tower P
Tower R
Common Areas
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M update
External tower works like texture and 1st coat of paint is completed. Other tower interior works like kitchen angles & granite counters, door frames & shutters, UPVC, tiling, putty & sanding, lift cladding etc. are in progress. For further details, please contact our Customer Service Manager.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N update
External tower works like texture and 1st coat of paint is completed. Other tower interior works like kitchen angles & granite counters, door frames & shutters, UPVC, tiling, putty & sanding, lift cladding etc. are in progress. For further details, please contact our Customer Service Manager.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q update
External tower works like texture and 1st coat of paint is completed. Other tower interior works like kitchen angles & granite counters, door frames & shutters, UPVC, tiling, putty & sanding, lift cladding etc. are in progress. For further details, please contact our Customer Service Manager.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P update
External tower works like texture and 1st coat of paint is completed. Other tower interior works like door frames & shutters, UPVC, tiling, putty & sanding, lift cladding etc. are in progress. For further details, please contact our Customer Service Manager.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R update
External tower works like texture and 1st coat of paint is completed. Other tower interior works like door frames & shutters, UPVC, tiling, putty & sanding, lift cladding etc. are in progress. For further details, please contact our Customer Service Manager.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Areas update
Works are in progress for the podium waterproofing, between K&Q and Q&L, and for the driveways and ramp. Basketball court soil compaction and WMM laying has been completed.
Tower M
Tower N
Tower P
Tower Q
Tower R
Common Area
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Update
External texture and painting works are in progress | Kitchen angles and granite counter works are in progress | Kitchen dado works are in progress | 1st coat of paint works is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Update
External texture and painting works are completed | Kitchen angles and granite counter works are in progress | 1st coat of painting work is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Update
Terrace water proofing works are in progress | External texture and painting works are completed | Water proofing works on 5tha are in progress | Door frame and shutter works are in progress on 5th floor | 1st coat of putty work is in progress
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Update
Terrace water proofing works are in progress | External texture and painting works are in progress | Kitchen angles and granite counter works are completed | 2nd coat of putty works is in progress | CP and Sanitary fixtures works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Update
External texture and painting works are in progress | 4th floor tiling works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Update
Basketball court works are in progress.
Tower M
Tower N
Tower P
Tower Q
Tower R
Common Area
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Updates
External texture and 1st coat of external painting works completed | Kitchen Granite counter work completed on 1st and 2nd floors | UPVC door works for balcony and utility area are completed on 1st and 2nd floors | Kitchen dado works are in progress | 5th floor primer work is in progress | Granite cladding work at lift area is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Updates
External texture and 1st coat of external painting works completed | Kitchen Granite counter works are in progress | Kitchen dado works are in progress | Granite cladding work at lift area is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Updates
Terrace water proofing works are in progress | 3rd and 4th floor waterproofing, plastering and cinder filling works are in progress | Door frames works completed on 1st, 2nd and 3rd floors | UPVC door works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Updates
Terrace water proofing works are in progress | External texture and 1st coat of external painting works completed | Kitchen Granite counter work completed on all floors | Enamel painting works on doors are in progress | 2nd coat of putty works completed till 5th floor | Granite cladding work at lift area is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Updates
External texture and 1st coat of external painting works completed | Preparation for dado is in progress | Sanding and touchup works are in progress on 5th floor | Granite cladding work at lift area is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Updates
Planter box work is in progress at Phase 3 play area | North and East side compound wall works are completed.
Tower M
Tower N
Tower P
Tower Q
Tower R
Common Area
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Updates
Stilt floor VDF works are in progress | External texture and paint works are in progress | UPVC door works are in progress | 5th floor flooring works are in progress | 4th floor primer work is in progress | Lift machine drive with control panel installation is completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Updates
External texture and paint works are in progress | Tiling work completed on all floors | Cabin framing works completed in lift 1.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Updates
Terrace initial water ponding works are in progress | Stilt floor PCC works in progress | 2nd and 3rd floor waterproofing and plastering works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Updates
Stilt floor VDF works are in progress | Stilt floor PVC pipe work is in progress | Cabin framing works completed in lift 1. | Internal flat finishing works (tiles, flooring, granite and painting) are completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Updates
Stilt floor VDF works completed | External texture and paint works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Updates
Phase 3 play area PCC works are in progress | Phase 3 transformer yard panel installation is completed.
Tower M
Tower N
Tower P
Tower Q
Tower R
Common Area
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Updates
Stilt level VDF works are in progress | External painting works are in progress | Staircase flooring works are in progress | UPVC Windows and ventilators shutters fixing works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Updates
LMR and SHR structural works in progress | 1st coat of external painting is completed | 3rd floor door works are in progress | 4th floor primer works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Updates
2nd and 3rd floor waterproofing coating works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Updates
Stilt level VDF works are in progress | 3rd floor door enamel painting works are in progress | UPVC Windows and ventilators shutters fixing works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Updates
Stilt level VDF works are in progress | Surface preparation works are in progress for external finishes | terrace water proofing works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Updates
Planter box block work is completed at Phase 3 play area | Phase 3 transformer yard panel and transformer fixing works are completed.
Tower M
Tower N
Tower P
Tower Q
Tower R
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Updates
External finishing works are in progress | Waterproofing works are in progress inside flats | 5th floor sanding work is in progress | Terrace waterproofing work is completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Updates
1st coat of external painting is completed | 1st floor Dado works are in progress | Waterproofing works are in progress | 5th Floor putty work is completed | External plumbing works in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Updates
Terrace slab is completed | Waterproofing works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Updates
Basement VDF work is in progress | Staircase Kota stone works are in progress | Waterproofing works are in progress | Door frame and shutter works are in progress on 5th floor | Wiring and switch boards installation works are in progress on 2nd floor | External plumbing works in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Updates
Basement grade slab work is completed | Basement VDF work is in progress | Waterproofing works are in progress.
Tower M
Tower N
Tower P
Tower Q
Tower R
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Updates
Door frames fixing on all floors are completed | External texture and painting works are in progress | Grinding and surface preparation works in progress at stilt area.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Updates
Tiling works, flooring and dado works are in progress on 5th floor | Floor protection works are in progress on 3rd and 5th floors | 2nd coat putty work is in progress on 5th floor | Main door works are in progress | External texture and painting works are in progress | External plumbing vertical pipe line works in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Updates
5th floor reinforcement work is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Updates
2nd floor bedroom door works are in progress | Wiring and switch board installation works are in progress on 2nd floor | External texture and painting works are in progress | External plumbing vertical pipe line works in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Updates
Door frames fixing on all floors are completed | Grinding and Surface preparation works in progress at stilt area | Basement grade slab works are completed.
Tower L
Tower M
Tower N
Tower P
Tower Q
Tower R
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower L Updates
Basement VDF flooring work is completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Updates
2nd coat of putty work is in progress on 4th floor | Sanding work is in progress on 3rd floor.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Updates
Flooring and dado works are in progress on 4th floor | Floor protection work is in progress on 2nd floor | 2nd coat of putty work is in progress on 5th floor.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Updates
3rd floor pour 1 wall panel work is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Updates
Main doors fixing on 2nd floor is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Updates
Water proofing, coating and protective plaster works are in progress on 5th floor | Back filling work is in progress at basement.
Phase 2 Towers
Tower M
Tower N
Tower P
Tower Q
Tower R
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Phase 2 Updates
Final cleaning works are in progress at Towers G, H and L | Corridor 2nd coat painting works are in progress at Tower J | CP and sanitary fittings works are in progress at Tower K | All lifts are handed over and currently operational in Phase 2 towers.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Updates
2nd floor putty work is in progress | Drive way casting works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Updates
Toilet wall tiling and floor tiling works are in progress | 3rd floor putty work is in progress | External surface preparation works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Updates
1st floor, pour II wall panel works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Updates
Ceiling putty works are in progress | Wall dado works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Updates
Parapet wall works are in progress.
Tower G, J, K, L
Tower H
Tower M
Tower N
Tower P
Tower Q
Tower R
Common Areas
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Updates
Handover is in progress | Lifts are operational and ready for handover.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower H Updates
Handover started | 1st lift is operational and ready for handover | 2nd lift commissioning works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Updates
5th floor slab work is completed | 1st coat of painting work is in progress on 4th floor.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower N Updates
2nd coat of painting work is in progress on 3rd floor | Water proofing and ponding works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower P Updates
Plinth beam work is completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower Q Updates
5th floor slab work is completed | Toilet wall tile works are in progress | Apartment floor tiles works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower R Updates
Terrace slab work is completed.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Common Area Updates
Phase 2 drive way works are in progress | Play area ramp works near OHT are completed | Basement parking work is in progress.
Tower G
Tower H
Tower J
Tower K
Tower L
Tower M
Tower N
Tower P
Tower R
Clubhouse
Common Area
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower G Updates
CP & Sanitary fittings installation works are completed | Second lift commissioning work is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower H Updates
Surface preparation works are in progress | Second lift cabin installation and commissioning works are in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower J Updates
CP & Sanitary fittings installation works are in progress on 2nd, 3rd and 4th floor | Corridor painting works are in progress | Screed works and shaft closing works completed | Second lift commissioning work is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower K Updates
CP & Sanitary fittings installation works are completed | Second lift commissioning work is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower L Updates
CP & Sanitary fittings installation works are completed | Second lift commissioning work is in progress.
TS RERA Number: P02200000165
* These are randomly clicked pictures of work in progress from preceding month. Not to be considered as progress in entirety.
Tower M Updates
Parapet wall and lift intermediate slab works are in progress.